Go Devil Maintenance Log

From RHPWiki
Revision as of 23:32, 18 June 2026 by RPellessier (talk | contribs) (New log, wiki editing thing)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Maintenance Log

9/ /03, Purchased boat motor and trailer from Walter Combs, 18 hours

10/24/03 Oil change, 26 hours.

8/15/04 Oil Change, 46 hours.

4/30/05 Oil, filter and extended oil drain plug. 67 hours

5/27/06 Oil, filter, 109 hours

4/29/07 Oil, filter, plugs, 145 hours

5/13/07 Air filter

9/26/07 Prop and lower seals, 167 hours.

5/24/21 Prop and nut and grease seal change, Prop was 9x6 SWC, Donna mentioned 9x5. About 250 hours. Changed Tach (& Hours meter).


6/18/2026 Sleeved grooved shaft with SKF Speedi-Sleeve 99811. Used JB Weld metal epoxy under sleeve to fill groove. Replaced grease seals.